Utility network tolerance fee

Compensation paid to a landowner for tolerating a communications network, which is paid only based on an application.

Tolerance fee

The processing of tolerance fees and the processing of applications is regulated by § 152 - § 156 of the Law of Property Act Implementation Act.

Enefit Connect OÜ pays a tolerance fee for tolerating the communication network located on the land units of the land for profit. The tolerance fee for the current year shall be paid no later than September 30 of the same year if the application is submitted no later than May 1 of the current year.

The location of the communication network belonging to Enefit Connect and the right to receive a tolerance fee on real estate can be checked in the Land Board's tolerance fee calculator.

Before submitting the application, read the Terms of Payment of Tolerance Fees and Application Processing.

Submitting an application

Application can be submitted in self service

Submit an application Submit an application

The right to submit an application belongs to the owner of the immovable or an authorized representative.

The application can also be submitted digitally signed to the e-mail address [email protected]

  • Application for communication network and facility tolerance fee for commercial land
  • If an immovable property consists of several immovables (i.e. several cadastral units), one application may contain up to three cadastral features.

    If a landowner wishes to submit an application for many immovables, the land units may be attached to the digitally signed application as table.

    Protection zone of a communication structure

    The extent of the protection zone of the communication structure is on both sides of the communication structure:

  • On land - 1 meter from the communication building or the outer wall of the communication building, in case of a free-standing mast 1 meter from the outer edge of the foundation;
  • On inland waterways - 100 meters from the centre line of the communication building;
  • At sea - 0.25 nautical miles from the centre line of the communication building.
  • Application for Elektrilevi utility grid tolerance compensation for the profit yielding land

    Are you our customer?Sign in Service

    Details of the registered immovable property owner:
    Name is obligatory
    Personal identification code is obligatory
    E-mail address is obligatory
    Telephone number is obligatory
    Contact address:
    The address is obligatory
    Details of the registered immovable property:
    Insert the name of the cadastral unit
    Insert the cadastral register number
    In case of a common ownership, insert the size of the share of the common ownership
    Please transfer the utility grid tolerance compensation on the bank account:
    Insert the bank account holder
    Insert the bank account number

    Field is required

    Field is required