Utility network tolerance fee
Compensation paid to a landowner for tolerating a communications network, which is paid only based on an application.
Tolerance fee
The processing of tolerance fees and the processing of applications is regulated by § 152 - § 156 of the Law of Property Act Implementation Act.
Enefit Connect OÜ pays a tolerance fee for tolerating the communication network located on the land units of the land for profit. The tolerance fee for the current year shall be paid no later than September 30 of the same year if the application is submitted no later than May 1 of the current year.
The location of the communication network belonging to Enefit Connect and the right to receive a tolerance fee on real estate can be checked in the Land Board's tolerance fee calculator.
Before submitting the application, read the Terms of Payment of Tolerance Fees and Application Processing.
Submitting an application
Application can be submitted in self service
The right to submit an application belongs to the owner of the immovable or an authorized representative.
The application can also be submitted digitally signed to the e-mail address [email protected]
If an immovable property consists of several immovables (i.e. several cadastral units), one application may contain up to three cadastral features.
If a landowner wishes to submit an application for many immovables, the land units may be attached to the digitally signed application as table.
Protection zone of a communication structure
The extent of the protection zone of the communication structure is on both sides of the communication structure:
Application for Elektrilevi utility grid tolerance compensation for the profit yielding land